Features
This is for perfect protection of heater and other device from inappropriate
circumstance or carelessness of operator through automatic detection of heater
load. MCU (microprocessor control unit) automatically detects the heater load
in real-time, and breaks the circuit when overload. In addition, LCD is adopted
for display the operation status and configuration. AHP bolt heater panel can
protect your heater and electrical equipment from any hazard.
- MCU automatically detects the heater load in real-time, and breaks the
circuit when overload.
- LCD is applied to display the operation status.
- Easy configuration and perfect protection for heater and electrical device
- Registered as No. 01708918 of utility model
Problems in existing heating controller
1. Manual input: Existing controller must be input manually with calculation
of heater load. Erroneous operation and damage to heater might happen due to
the mistake of operator.
2. Shorter lifetime: Lifetime of heater is reduced because high density heater
is exposed to air during disjoint.
3. Delay of working time: Operator should conduct the insertion of heater, time
check for disjoint, joining/disjoint of terminal board by himself.
1. MCU automatically detects the heater load in real-time, and breaks the circuit
when overload.
2. LCD is applied to display the operation status.
3. Easy configuration and perfect protection for heater and electrical device
4. Registered as No. 01708918 of utility model
AHP Panel supply history records
1997 Uljin nuclear power plant
1998 Incheon thermal power plant
1999 Uljin nuclear power plant
2000 Shin Incheon thermal power plant
2001 Yeongnam thermal power plant
Yeonggwang nuclear power plant
Wolseong nuclear power plant
2002 Wolseong nuclear power plant
Yeonggwang nuclear power plant
Gori nuclear power plant
Yeongheung thermal power plant
Doosan heavy industry
2003 Boryeong thermal power plant
Taean thermal power plant
Busan thermal power plant
Posco
2004 Uljin nuclear power plant
Busan thermal power plant
Yeongheung thermal power plant
Uljin nuclear power plant
Yeonggwang nuclear power plant
Posco
2005 Bundang complex thermal power plant
Boryeong thermal power plant
New world (Australia)
2006 Uljin nuclear power plant
Performance and structure
- Delay time: 0.5 ~ 20 sec
- Automatic load detection: 0 ~ 55 A (automatic detection)
- Load rate: 5 ~ 15%
Application area
- Bolt heater control, which is used for disjoint/assembly of bolt at power
plant and industrial vapor turbine.
|